Skip the menu

For plant supervisors

Plain reference for running a small plant

Shop Floor Notes covers maintenance, quality, scheduling and plant software for managers and supervisors, with worked examples you can redo with your own numbers.

Try the OEE calculator Open the floor reference

A machine operator in a blue uniform working at a metal-forming machine
joydo via Pixabay

Field calculator

OEE calculator for a machine or production line

Work out availability, performance, quality and OEE from one shift's numbers.

Start measuring

You bring

  • Planned production time (minutes)
  • Downtime during that time (minutes)
  • Ideal cycle time (seconds per part)
  • Total parts made, good and bad
  • Good parts made

Floor reference

Reference for the supervisors and managers who keep a small plant running: checklists, a glossary and plain guides. The numbers in the examples are made up, so you can redo each calculation with your own.

See the whole Floor reference

Where to begin