Skip the menu

Maintenance

Preventive schedules and downtime tracking for older equipment.

Older equipment runs on routine more than on luck. These articles cover preventive schedules, how to record downtime so the data is usable, and how to decide which jobs deserve a fixed interval and which can wait for a work order.

The floor reference has a preventive maintenance checklist you can adapt, and the OEE guide shows how a downtime log turns into a number you can track.

A technician wiring components inside an electrical control cabinet
AndGra via Pixabay

Read these first